Pool Emergency Action Plan Template

Last updated

Written emergency action plan posted at a pool, pool emergency action plan template

A pool emergency action plan template is only useful if every section gets filled in with your facility’s actual details. A generic plan with blanks is what most facilities have, and it is why plans fail under pressure.

Pool Emergency Action Plan Template Section by Section

1. Facility details. Full street address as a dispatcher needs to hear it, nearest cross street, which entrance emergency services should use, and gate or door codes.

2. Venue. One plan per body of water. A site with three pools needs three plans, because a response in one must not strip cover from the others.

3. Assigned roles. Primary rescuer, secondary rescuer bringing equipment, zone cover for the vacated zone, caller, greeter for the ambulance, crowd control. Named by position, not by person, so the plan works whoever is on shift.

4. The call script. Written out: address, nature of emergency, number of casualties, condition, entrance to use, and the statement that this is an aquatic incident.

5. Equipment locations. AED, oxygen, backboard, first aid kit, phone, and the route to each.

6. Activation signal. Usually three short whistle blasts. State it.

7. Reduced staffing variant. What the plan becomes when you are a guard short, which usually means closing a venue rather than pretending the roles are covered.

8. Post-incident actions. Water closure and reopening criteria, incident report, equipment restock, staff support, and review.

Rehearse it, then fix it

A pool emergency action plan template becomes a plan when it is drilled. Run it, note where it broke, and amend the document the same week.

Post it where it is used

At the stand and beside the phone, not in a manager’s binder.

Pool emergency action plan template: frequently asked questions

What sections does a pool emergency action plan template need?

Facility details with the full address and entrance, one plan per body of water, assigned roles named by position, a written call script, equipment locations, the activation signal, a reduced staffing variant, and post-incident actions.

Why name roles by position rather than person?

So the plan works whoever is on shift. Naming individuals means the plan is wrong every time the rota changes.

Where should the plan be kept?

At the stand and beside the phone, where it is actually used, rather than in a manager binder. A plan that is filed rather than drilled does not work under pressure.

American Aquatics and Safety Training, Inc. is a 501(c)(3) nonprofit organization. Tax ID (EIN) 83-4426661.

70 E. Sunrise Highway, Suite 500, Valley Stream, NY 11581

About our organization

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.